|
St. Vincent de Paul Church
For the past year I have had the privilege of working with Ms. Barbara Rounds and Mr. Tom Longerbone. It is because of my appreciation of their expertise that I am writing to you.
I would encourage anyone to work by their side and observe them in action. Indeed anyone that has Barbara Rounds and Tom Longerbone assigned to their team will be working with the BEST.
Kathleen OHara, Principal
St. Vincent de Paul School
Project Information
This project was a 9000 square foot design/build addition to the existing facility. It involved adding six classrooms, two large restrooms, and enough hallway lockers to accommodate the additional class space. This project took place while the school was in session. VSI had to take extra precautions to maintain adequate fire exiting, along with minimum noise levels causing disruption during school hours. The building was originally built with the intention of an addition at some point in time. However, the utility futures were not sized adequately. Our design team was able to come up with cost effective measures to meet the clients budget.
|
|

Contributions From
- Kathleen OHara, Norm Olafson, Jim Volp Owner Representatives
- Randy Engel, AIA (Project Architect) Buetow and Associates
- Ronn Winkler, Winkler Structural Engineers
- Clark Engineering Corporation
|