Parkway Technology
Congratulations on the successful completion of the Parkway Technology Campus building in White Bear Township. Cortec Corporations new warehouse is the best on the block and our neighbors are jealous. The construction was an organizational masterpiece and I couldn't be more satisfied with the result. Thank you, from all of us at Cortec Corporation. It is a good feeling to work with an accomplished professional.
-Boris A. Miksic, President/CEO Cortec Corporation
Project Information
56,000 square foot pre-cast concrete office and warehouse building. The biggest challenge of the project consisted of raising the grade after the owner had obtained a conditional use permit for the building 6 years earlier. The entire elevation was raised 1 foot and one of the two original storm drainage ponds were eliminated. The remaining pond was enlarged to accommodate the hydrogenous calculations for rainfall. This change spotted by VSI Construction saved the owner over $30,000.
|
|

Contributions From
- Cortec Corporation Boris Miksic, President
- Cortec Corporation Sandra Johnson, Corporate Comptroller
|